Safety Precautions for Operating Remote-Controlled Single-Girder Rubber-Tyred Cranes
I. Pre-Operation Inspection (Mandatory; No Omissions Allowed)

1. Personnel Qualifications
Operators must hold valid certification (Special Equipment Operation Certificate) to perform duties. Operation is strictly prohibited for individuals who are unlicensed, under the influence of alcohol, fatigued, or unwell.
Operators must be thoroughly familiar with the functions of the remote controller, the performance specifications of the equipment, the site environment, and all command signals.
2. Comprehensive Equipment Inspection
Tires and Chassis
Tire pressure must be normal; tires must be free of damage, bulges, or cracks.
Wheel hub bolts must be securely tightened; outriggers (if applicable) must be intact and their locking mechanisms reliable.
The ground surface must be firm and level; operations are prohibited on soft ground, slopes, uneven terrain, or areas with standing water.
Metal Structures
Welds on the main girder, end girders, and outriggers must be free of cracks, deformation, or weld failure.
Hoisting Mechanism
Wire Ropes: Must be free of broken strands, loose strands, excessive wear, corrosion, or kinking; lubrication must be adequate.
Hooks: Must be free of cracks or deformation; the anti-decoupling device must be functional.
Pulleys and Drums: Must be free of damage or rope jamming.
Braking and Limiting Systems
Hoisting and travel brakes must be responsive and reliable, free of abnormal noises, and prevent load drift or vehicle creep.
The upper limit switch, travel limit switches, and overload limiter must be functional.
Remote Control System
The remote controller must have sufficient battery power; the signal must be stable, free of latency, and free of interference.
The emergency stop button and antenna must be intact; the controller must be assigned to a specific operator and must not be discarded carelessly or lent to others.
Hydraulic / Power Systems
Fluid levels (hydraulic oil, coolant) and electrical power supply must be adequate; there must be no leaks.
No-Load Test Run
Hoisting, traveling, and luffing (boom adjustment) movements must be smooth, free of abnormal noises, lateral deviation, or loss of control.
3. Environment and Load
The work area must be cleared of obstructions and designated as a warning zone; unauthorized personnel are strictly prohibited from entering. Verify the weight and center of gravity of the load; overloading, exceeding the maximum radius, or exceeding the maximum boom angle is strictly prohibited.
Ensure lifting gear is in good condition; pad sharp edges and ensure the load is securely lashed.
II. Operational Procedures (Core Safety)
1. Key Points for Remote Control Operation
Use "inching" (momentary pulses) initially, followed by smooth, steady movement; avoid sudden starts, sudden stops, or abrupt steering changes.
Maintain a safe communication distance; avoid obstructions and sources of signal interference.
Sound the bell or activate audible/visual warnings during operation to alert personnel in the vicinity.
Keep the remote controller in hand at all times; placing it on the ground or letting go of it is strictly prohibited.
2. Lifting and Traveling
Mandatory Test Lift: Raise the load 100–200 mm off the ground, then pause to inspect the brakes, rigging, and load stability.
Lifting at an angle (side-pulling) is strictly prohibited; the lift must be executed vertically.
Maintain a clearance of at least 0.5 meters between the load and any obstacles; never pass the load over personnel or equipment.
Travel smoothly and at low speed; avoid high-speed turns and driving over ditches or curbs.
Decelerate in advance when approaching the destination, obstacles, or personnel.
3. Load and Movement Restrictions
When the load is ≥ 90% of the rated capacity:
Perform only one movement at a time (simultaneous lifting/lowering, traveling, and slewing is strictly prohibited).
Execute lifting/lowering and boom luffing movements slowly; lowering the boom is strictly prohibited.
Do not leave the load suspended for extended periods; the load must be lowered and unloaded before stopping work or powering down.
4. Signaling and Coordination
Respond only to signals from the designated signaler; however, any "Emergency Stop" signal issued by anyone must be executed immediately.
Immediately stop operations if signals are unclear, visibility is poor, or any anomalies are detected.
III. Post-Operation Procedures (Preventing Hazards & Extending Service Life)
Lower the load to the ground; raise the hook to the designated **upper safe height**; return the trolley/boom to its home position.
Park the mobile crane in a level, firm, and safe area; engage the parking brake and place wheel chocks.
Cut off the main power supply, switch off the remote controller, remove the ignition key, and securely stow the remote unit.
Clean the equipment; inspect the wire ropes, structural components, and tires; check for any oil or fluid leaks.
Complete the operational log, recording any faults or specific handover details. IV. Emergency Procedures
Remote Control Failure / Signal Loss: Immediately press the emergency stop button on the remote control → Press the emergency stop button on the machine body (if accessible) → Cut off the main power supply.
Hook Slippage / Load Descent: Engage emergency stop, cut power, and inspect the braking system; strictly prohibit forced operation while under load.
Abnormal Noise, Odor, Smoke, or Oil Leakage: Immediately stop the machine, cut power, evacuate the area, and report the incident.
High Winds (Force 6 or higher), Heavy Rain, or Dense Fog: Immediately cease operations and secure the equipment.
Risk of Collision / Tipping: Engage emergency stop, lower the load, and evacuate the area; strictly prohibit taking risks to resolve the situation.
V. Absolute Prohibitions (The "Ten No-Lifts" + Specific Rules for Mobile Cranes)
Do not lift without proper certification, while under the influence of alcohol, while fatigued, or without clear instructions.
Do not lift in cases of overloading, unknown load weight, exceeding the working radius, or exceeding the maximum boom angle.
Do not lift using oblique pulls or side drags; do not lift if personnel are standing on the load; do not lift unsecured or floating objects.
Do not lift if safety devices are malfunctioning, or if wire ropes or hooks exhibit severe defects.
Do not lift in conditions of insufficient lighting, poor visibility, soft ground, or on slopes.
Do not lift objects that are buried or pinned down; do not lift objects with sharp edges unless padded; do not lift loads that are insecurely rigged.
Do not lift if the remote control is malfunctioning, the signal is unstable, or the emergency stop is inoperative.
Do not lift if tires or outriggers are faulty, or if the chassis is unstable.
Do not lift if personnel are standing above or beneath the load, or if the load must pass over a designated walkway/thoroughfare.
Do not lift explosive, highly toxic, or unsecured hazardous materials.
VI. Key Points for Routine Maintenance
Daily: Inspect tires, brakes, limit switches, wire ropes, and the remote control unit.
Weekly: Lubricate components, tighten bolts, clean the equipment, and charge/replace batteries.
Monthly / Periodically: Check hydraulic fluid levels and filter elements; inspect structural welds and electrical wiring; calibrate safety devices.