Industrial Electromagnetic Lifters: Reconstructing heavy-load handling logic, bringing steel circulation into the "second-level era"
In the raw material workshop of a steel plant, a 30-ton coil of hot-rolled steel awaits transfer. In the past, workers would spend 20 minutes hooking and balancing the coil, and even the slightest mistake could damage it. Now, with the press of a button, the red electromagnetic lifter slowly descends, instantly and securely gripping the coil. Lifting, transferring, and landing are completed within a minute—this is the "handling revolution" brought about by industrial electromagnetic lifters. From "piecemeal" scrap collection to the massive lifting of wind turbine towers, electromagnetic lifters are leveraging "magnetism" to drive efficiency upgrades in heavy industry.

A revolution in scenarios: A "magnetic network" covering the entire industrial chain
The application of industrial electromagnetic lifters has expanded from single-handling operations to full-process optimization. Customized solutions for different scenarios are reshaping industry efficiency:
1. Steel mills: Seamless flow from raw materials to finished products
Raw material storage: MW84 series electromagnetic lifters (0.4-3.35kW power) enable mixed lifting of "steel plates, steel coils, and steel billets," achieving a lifting accuracy of ±2mm for 10-ton steel plates;
Hot rolling mills: Ultra-high-temperature electromagnetic lifters (700°C resistant) directly grasp red-hot steel billets, eliminating the redundant "cooling-handling-heating" steps;
Finished product warehouses: Permanent magnetic lifters integrate with WMS systems to automatically identify coil numbers and locations, improving outbound efficiency by 300%. 2. Ports/Terminals: The "Efficiency Engine" of Bulk Material Handling
Scrap Steel Recycling: Submersible electromagnetic lifters (waterproof to a depth of 100m) can lift scrap steel from ship holds and riverbeds, with a single unit capable of handling up to 150 tons per hour.
Coil Material Handling: Multiple linked electromagnetic lifters (such as Airpes' custom lifting beams) can simultaneously lift six coils of steel strip, reducing dock loading and unloading time from 12 hours to 4 hours.
3. Smart Manufacturing: The "Key Piece" of Flexible Production Lines
Automotive Welding: Automated permanent magnetic clamps enable rapid switching between steel plates and profiles, reducing mold changeover time from 30 minutes to 3 minutes.
Wind Power Manufacturing: 200-ton electromagnetic lifters combined with an intelligent monitoring system enable damage-free installation of wind turbine towers (4m diameter, 12m length), increasing the pass rate to 100%.
