"Mobile Heavy Equipment" for Concrete Component Lifting: Double-Girder Double Electric Hoist Tire Crane
Precast components are heavy and large, making lifting them risky due to swaying, slow speed, and site limitations? This double-girder double electric hoist tire crane maximizes the stability, flexibility, and efficiency of concrete component lifting!

Technical Parameters:
| Rated load capacity | 80T (two electric hoists, each 40T, working together for lifting) Stable lifting of large-volume precast beams, wall panels, piers, and other heavy concrete components. |
| Main beam span | 12m (optional 10-15m) Adaptable to the lifting spacing of precast component storage yards/construction sites, covering common component sizes |
| Lifting height | 10m (optional 8-12m) Precisely connects to storage yard racks and construction site hoisting positions with a height of 8-12m |
| Lifting system | Two 40T electric hoists; Lifting speed: 8m/min fully loaded, 12m/min unloaded. Synchronous lifting by both hoists prevents component swaying; speed adapted for stable lifting of heavy components. |
| Remote Control System | 2.4G industrial-grade wireless remote control, effective distance ≥50m. Operators can remotely control from a safe area, avoiding operation in high-risk hoisting zones. |
✅ Double Girder Double Hoist, Stable Lifting of Heavy Components: The double-girder structure and double electric hoists work together to lift large-volume concrete components such as precast beams, wall panels, and piers with an 80-ton rated load capacity (SWL 80T). This ensures stable lifting without swaying and zero-deviation landing, perfectly preventing component damage and cracking, and meeting the heavy component transportation needs of precast plants/construction sites.
✅ Tire-mounted Trackless, Go Wherever You Need to Lift: Free from the constraints of tracks, the heavy-duty wear-resistant tires are suitable for construction site gravel roads and hardened storage yard surfaces, eliminating the need for pre-laying tracks and site modifications. From the precast plant's material storage area to the on-site lifting position, it can be driven directly to the work site, saving on site adaptation costs and time. ✅ Wireless remote control, safe and efficient single-person operation: The operator holds the remote control and stands in a safe area (away from the lifting risk zone) to precisely control lifting, luffing, and movement. A simple press of a button completes the entire "lifting-transfer-positioning" process, eliminating the need for multiple people to issue commands. This ensures safety and increases lifting efficiency by 30%.
"Site flexibility + worry-free operation" for lifting concrete components—one machine is all you need!
Rated load capacity 80T (two electric hoists, each 40T, working together for lifting) Stable lifting of large-volume precast beams, wall panels, piers, and other heavy concrete components.
Main beam span 12m (optional 10-15m) Adaptable to the lifting spacing of precast component storage yards/construction sites, covering common component sizes.
Lifting height 10m (optional 8-12m) Precisely connects to storage yard racks and construction site hoisting positions with a height of 8-12m.
Lifting system: Two 40T electric hoists; Lifting speed: 8m/min fully loaded, 12m/min unloaded. Synchronous lifting by both hoists prevents component swaying; speed adapted for stable lifting of heavy components.
Travel system: Hydraulically driven heavy-duty double-row tires (6 wheel sets); Travel speed: 5km/h unloaded, 3km/h fully loaded; Turning radius 8m. Adaptable to construction site gravel roads/hardened surfaces; flexible movement even in narrow spaces without pre-laying tracks.
Power configuration: Yuchai. YC4D140 diesel engine (103kW power): Continuous operation ≥8 hours, supporting all-day precast component hoisting/relocation needs.
Remote Control System: 2.4G industrial-grade wireless remote control, effective distance ≥50m. Operators can remotely control from a safe area, avoiding operation in high-risk hoisting zones.
Safety Configuration: Lifting capacity limiter + travel limit switch + emergency stop button. Multiple protections prevent overload and overtravel, ensuring the safety of components and personnel.
