Inquiry
Form loading...

Semi-gantry Crane: a "boundary breaker" of workshop space

Between the steel columns of the workshop, a bright yellow semi-gantry crane breaks the shackles of the factory layout with its "single-sided legs clinging to the columns, and the main beam cantilevering across the obstacles" - turning the columns from "spatial barriers" into "hoisting fulcrums", and building an "air corridor" for efficient transportation in the gap between the equipment area and the material area.

    Between the steel columns of the workshop, a bright yellow semi-gantry crane breaks the shackles of the factory layout with its "single-sided legs clinging to the columns, and the main beam cantilevering across the obstacles" - turning the columns from "spatial barriers" into "hoisting fulcrums", and building an "air corridor" for efficient transportation in the gap between the equipment area and the material area.

    20221013170719170(1).jpg

    Technical Parameters:

    Lifting Capacity 5~20 tons (mainstream 10t)
    Span 7.5~25m (12~20m recommended)
    Cantilever Length 5~15m (customized ≤18m)
    Lifting Height 4~12m (clearance ≥3m)
    Hoisting speed 8~16m/min (dual-speed type 16/2m/min)

    Breaking the spatial barrier: Transforming columns into "hoisting springboards"
    ✅ Ingenious single-sided outrigger design: One side runs along the track against the column, while the other cantilevers out 5-15 meters. This transforms the "gray area" outside the column into a work area, saving 50% of track space and enabling renovations without disturbing the foundation.
    ✅ Flexible span adaptation: The 7.5-25m main beam span precisely matches the factory column spacing (with an error of ≤±50mm), creating a "custom track" for the workshop and adapting to diverse production lines from machining to new energy.
    ✅ Balanced lightweight and rigidity: The Q355B manganese steel box-type main beam is welded and inspected, resulting in a 25% reduction in deadweight compared to full-gantry cranes, yet capable of supporting loads of 5-20 tons. Static deflection at mid-span is ≤L/1000 (L = span), ensuring rock-solid stability for hoisting molds and steel.

    All-purpose handling hub for the workshop
    🔹 Equipment lifting: Lifting heavy machine tools and welding equipment, the boom lift reaches deep into the production line, replacing forklifts' roundabout lifting routes and increasing efficiency by 60%;
    🔹 Material flow: Steel, molds, and semi-finished products shuttle between columns, and docking roller conveyors enable direct connection to the production line, eliminating ground-level congestion;
    🔹 Customized breakthrough: Explosion-proof models tackle chemical workshops, while high-temperature-resistant models conquer heat treatment lines, becoming the workshop's "mobile joint" and adaptable to extreme scenarios.

    Request a Quote

    Whatsapp: +86-19836285213

    Wechat: +86-19836285213

    Contact Us Now