Inquiry
Form loading...

"Stabilizer" for long tube lifting: Simple lifting beam

Applicable scenarios: Port steel pipe unloading, wind turbine tower transfer, construction site pipeline lifting, factory long pipe handling, etc.

    Are steel pipes unloaded at the port still wobbling and spinning, and towers being transported at the construction site still deforming due to single-point loads?

    wechat_2025-08-06_093029_968(1).jpg

    Simple lifting beams offer a "stability lock" for lifting long tubular cargo with "multiple lifting points and uniform force + adaptive adaptation"!

    🔹 "Beam Uniform Force": Taming the "restlessness" of long tubes

    Customized beams match tube lengths, with multiple sets of lifting points simultaneously tightened—distributing the weight of long tubes across the entire area, eliminating the twisting and rolling risks of single-point lifting straps. Even 100-meter wind turbine tower sections can be lifted horizontally, as if they were a "fixed-length straight line."
    🔹 "Simple Logic": Hardcore efficiency for fast assembly and lifting

    No complex debugging required! The crossbeam features built-in adjustable lifting points (spacing and height adapt to pipe diameters), and dual hook/sling interfaces are compatible with crane hooks. From rusty steel pipes at the port to corrosion-resistant pipes on the construction site, pipe diameters from 20cm to 5m are compatible, cutting hooking time in half and eliminating the need for slow, long-pipe lifting.
    🔹 "Safety Armor": Locking in every lift.
    Anti-unhook clips, anti-slip pads at the lifting points, and anti-deformation reinforcements on the crossbeam...provide comprehensive protection from the hook to the pipe. Furthermore, the crossbeam is corrosion-resistant against salt spray from the port and dust from the construction site. Even after six months of outdoor operation, the lifting points remain secure, completely eliminating the risk of slipping.
    🔹 "Universal" Application: "Full Lifecycle Handling" of Long Pipes

    During unloading, precise docking of long pipes within the cargo ship's hold is achieved; during transfer, efficient connection to flatbed trucks is achieved (as shown in the scenario shown). Even within the factory, steel pipe straightening and tower alignment can be achieved through the crossbeam, achieving "horizontal lifting and precise alignment" – a single set of crossbeams ensures "full stability" for long pipes from factory to installation.

    When the crane hook is raised, the simple lifting crossbeam's "uniform force magic" rewrites the fate of long pipe lifting: no more worrying shakes, no more rework due to deformation, making every lifting and lowering of long pipes a "dual benchmark of safety and efficiency"!

    (Applicable scenarios: Port steel pipe unloading, wind turbine tower transfer, construction site pipeline lifting, factory long pipe handling, etc.)

    Request a Quote

    Whatsapp: +86-19836285213

    Wechat: +86-19836285213

    Contact Us Now