Inquiry
Form loading...

The Construction Site's "Heavyweight Lifter": The Double-Girder Tire-Mounted Crane, the "Dedicated Courier" for Heavy Concrete Components.

The toughest challenges in hoisting precast components on construction sites are handled by this double-girder tire-mounted crane!

    The toughest challenges in hoisting precast components on construction sites are handled by this double-girder tire-mounted crane!

    ScreenShot_2025-12-17_140638_854.jpg

    Technical Parameters:

    Rated Lifting Capacity 20t-100t (Suitable for the weight range of heavy-duty precast concrete beams, precast piers, and other components; can stably lift ultra-large precast components weighing up to 100 tons)
    Span (Double Main Beam Spacing) 12m-28m (Covering multiple rows of precast component stacking areas on construction sites; a single operation can cover a wider stacking area)
    Lifting Height 15m-22m (Meets the vertical operation requirements of multi-layer precast component stacking and high-altitude hoisting positions)
    Lifting Speed Speed 0.8m/min (heavy load mode) - 3.2m/min (light load mode) (Slow and stable lifting of concrete components under heavy load to avoid swaying and collision; increased speed and efficiency under light load)
    Cable reel parameters Cable capacity 50m-100m, rated voltage 380V (continuous and stable power supply, no battery life limitation, suitable for long-distance operation on construction sites)

    It's a natural "powerhouse": the double-girder structure provides a built-in "load-bearing buff." Heavy concrete components weighing tens of tons are securely held in place under the hook, making precast beams and piers its everyday "delivery packages." It's also the most flexible member of the construction site: no need for pre-laid tracks; its four tires allow it to easily move from the component stacking area to the hoisting position, going wherever needed. And the power supply is always reliable: the cable reel continuously delivers power, from morning till night without interruption, eliminating the worry of "power outages."

    What used to take half a day and involved multiple pieces of equipment to hoist heavy components can now be handled by this single crane, dramatically increasing construction site efficiency! Double-girder tire-mounted crane (dedicated to heavy-duty concrete components)

    Request a Quote

    Whatsapp: +86-19836285213

    Wechat: +86-19836285213

    Contact Us Now